Construction has begun!

We have begun the construction of the docks (2 starting docks and 4 exit docks) and are finishing constructing a retaining wall on the north side of the lake. We will begin construction of the building as soon as weather permits. We will also be pouring concrete and laying astro turf along the northern shore of the lake. We have the cable system equipment ready and in March/early April we will begin the installation as soon as the lake melts.